Swaney Group Operating System

The operating system
that compounds
portfolio value.

A proprietary operating system deployed inside PE-backed industrial companies. Built over 15 years. Measured from day one. Principal capital in every deal.

30+
Companies Transformed
15+
Years Deployed

Not a playbook. A deployed operating system.

"Scientifically enhance every facet of portfolio assets."

SGOS is a structured operating system built over 15 years inside 30+ PE-backed companies. It deploys at the site level, measures against a hard baseline, and is designed to hold after we leave.

Every deployment is configured to the company. Every principal has personal capital in the outcome.

I

Diagnostic Precision

We measure before we move. Time studies, value stream mapping, and site diagnostics set the baseline. No intervention starts without data.

II

Structured Implementation

A disciplined 12-week model. Each phase has defined deliverables and exit gates. The site team builds capability as the system goes in.

III

Cultural Sustainability

The system transfers to the site team. Gains hold through leadership changes, ownership transitions, and exits.

IV

Exit-Ready Performance

Every engagement is built with the exit in mind. EBITDA expansion, throughput gains, and operational KPIs are documented and data room-ready.

15 years.
30+ companies.
One system.

Deployed across industrial, manufacturing, and specialty services companies. Every outcome measured. Every result documented. Available under NDA to qualified LPs.

30+
Companies Deployed
Manufacturing, industrial services, specialty sectors
15+
Years of Methodology
Refined in live PE-backed environments, not a lab
12
Week Standard Deployment
From Boot Camp kickoff to production system launch
100%
Principal Alignment
Principal skin in the game on every active engagement
Representative Engagements
Industrial Manufacturing

Multi-Site Production System

Full system deployment across primary manufacturing sites. Baseline diagnostic in week one. Throughput up, non-value-added time down inside 12 weeks.

Full case study available under NDA
Specialty Services

Capacity Expansion Without Capex

Wrench time analysis revealed latent capacity that wasn't showing up in the numbers. Output increased. No new equipment, no capex.

Full case study available under NDA
PE Exit Readiness

Performance Documentation for Data Room

Engagement structured around the buyer's diligence checklist. EBITDA expansion and operational metrics documented before the process opened.

Full case study available under NDA

Five phases.
Zero guesswork.

Five phases. Defined deliverables at each gate. Refined across 30+ engagements so nothing is left to interpretation.

Phase 01
Prepare
Site readiness check, stakeholder alignment, Boot Camp kickoff. Everyone from leadership to the floor knows the plan and their role before any data collection starts.
Phase 02
Analyze
Time studies, value stream mapping, floor-level interviews, and skills assessment. We build an objective picture of how the operation actually runs — not how leadership thinks it runs.
Phase 03
Strategize
Baseline readout with site leadership. Gap to world-class quantified. Interventions ranked by impact and speed. The 90-day roadmap is locked before we leave the room.
Phase 04
Implement
The system goes live. Daily huddles, visual management, standardized work, and performance cadences are built and running — not in a deck, on the floor.
Phase 05
Sustain
Ownership transfers to the site team. The system runs without us. Results documented for board reporting, LP updates, and the exit data room.
PWS
Paul W. Swaney III
Principal, Swaney Group Capital

Operators who invest. Investors who operate.

Paul Swaney built SGOS over 15 years inside PE-backed industrial companies. He is not a visiting advisor who delivers reports. He deploys the system, sits on the board, and has personal capital at risk in every active engagement.

That alignment is structural. When the portco wins, the principals win alongside the LPs — every time.

30+ companies across industrial manufacturing and specialty services over a 15-year career
Personal capital deployed in active portfolio companies alongside institutional LP capital
Active board seats in current portfolio companies — governance and operational oversight, not advisory titles
Co-investing with institutional PE sponsors including LongueVue Capital on current active engagements

Why SGOS outperforms
traditional ops consulting.

01
Proprietary methodology, not borrowed frameworks
Built in live PE-backed environments — not licensed from a consulting firm. Fifteen years of what actually works inside industrial companies under real ownership pressure.
02
Principal capital aligned with LP outcomes
No fee-for-service misalignment. The principals co-invest personal capital in every active portco. When the exit happens at a premium, everyone at the table made the same bet.
03
Documented results, built for the data room
Every engagement produces a documented performance record — baseline to exit-ready. EBITDA expansion, throughput, and operational KPIs tracked and available under NDA to qualified investors.

Ready to see the system?

LP materials, case studies, and methodology documentation available to qualified investors.

Request Access